From above: What traffic on the Gordie Howe bridge looks like

CBC CBC

The first wave of vehicles cross the newly-opened Gordie Howe International Bridge, connecting Windsor, Ont., and Detroit, Mich., on July 27, 2026.https://i.cbc.ca/ais/aa409dcb-989d-4c03-bf6a-6763d3b0973d,1785173166987/full/max/0/default.jpg?im=Crop%2Crect%3D%280%2C279%2C5363%2C3016%29%3BResize%3D%28620%29" title="The first wave of vehicles cross the newly-opened Gordie Howe International Bridge, connecting Windsor, Ont., and Detroit, Mich., on July 27, 2026." width="620" />

After multiple delays, the Gordie Howe International Bridge, linking Detroit and Windsor, Ont., finally opened to traffic July 27, 2026.

Read full article at CBC →